Skip to content
  • info@ts-works.nl
  • +31 614 530 000
  • Ma - Vr 07.00 - 17.00
TS WORKS B.V.

TS WORKS B.V.

Building & construction company

  • Home
  • About
  • References
  • Projects gallery
  • Contact
  • Nederlands
  • English

Category: Excavation

  • Home
  • Excavation

Extension at the back with the folding doors

April 6, 2022April 8, 2022 admin
Building construction, Construction, Excavation, Foundation, Isolation, Plastering, Roofing, Walls, Windows & Doors bricks, concrete, construction, extension, floor, glass door, isolation, renovation, steel beam, wood

Excavation of the foundation

June 28, 2018June 28, 2018 admin
Excavation, Foundation construction, foundation, outdoor

Categories

  • Project Gallery (57)
    • Building construction (23)
      • Construction (9)
      • Demolition (2)
      • Excavation (2)
      • Foundation (4)
      • Installation (6)
      • Isolation (3)
      • Plastering (8)
      • Roofing (5)
      • Walls (6)
      • Windows & Doors (1)
    • Interior finishing (41)
      • Attics (2)
      • Bathrooms (16)
      • Floors (11)
      • Iron work (2)
      • Kitchens (5)
      • Lights (6)
      • Outdoor Painting (1)
      • Painting (8)
      • Showrooms (4)
      • Stairs (2)

Tags

attic bathroom black ceiling concrete construction design radiator electrical installation extension fireplace floor floor heating foundation garden glass grey installation isolation kitchen led lights light light brow marble mosaic tiles outdoor painting parquet plastering rain shower renovation roof sand shower showroom spot lights stairs steel tiles toilet wall walls white window windows wood

Contact

  •   info@ts-works.nl
  •   +31 614 530 000
  •   Ma - Fr 07.00 - 17.00

TS WORKS

  • About Us
  • References
  • Privacy Statement
copyright © 2017 - 2025 TS WORKS    webdesign: dansof.nl